A concept built for Baytech Plastics by Cilantric · not your live system · sample data, yours to keep
Live · A-shiftElizabeth St · MidlandSF

30+ presses · one screen · on top of your new ERP

Every press reporting its own OEE, in real time, the way a floor should.

You ran tooling ops at Husky across four countries, so you already know what a floor looks like when the machines tell you their availability, performance, and quality instead of you chasing it on a clipboard. You just laid the ERP backbone. This is the live shop-floor layer that bolts on top of it — no new box on the floor, no capex, just the press-hours you're already paying for made visible. Sample data below, modelled on a large-tonnage injection floor.

68.4%
Plant OEE · A-shift
▲ 2.1 pt vs 30-day avg
89.7%
Availability
uptime across 31 presses
81.2%
Performance
cycle drift on 4 presses
3.1%
Scrap rate · shift
target < 2.0% · 2 presses over

Press-by-press · live OEE

sorted by biggest loss
PressRunningA / P / QOEEState
Press 142,000-ton · Cell C Magna — instrument carrier — / 61 / 94
0%
Down · hydraulic
Press 271,500-ton · Cell D Continental — housing 96 / 58 / 88
49%
Cycle drift
Press 061,100-ton · Cell B NCR — kiosk bezel 88 / 74 / 91
59%
Scrap > target
Press 191,750-ton · Cell C Amico — bracket assy 91 / 80 / 96
70%
Short stops
Press 03850-ton · Cell A Christie — chassis panel 94 / 86 / 98
79%
Running
Press 221,300-ton · Cell D Magna — battery tray 97 / 90 / 99
86%
Running
Press 11500-ton · Cell A — · changeover — / — / —
Mold change · 22 min

Live alerts

auto-generated
!
Press 14 down — 38 min
Hydraulic fault on the 2,000-ton. ~$1,900/hr of contribution stalled while the Magna job waits.
Press 27 cycle 14% over standard
Actual 63.2s vs 55.4s standard. Drift like this hides ~0.8 press-shifts/wk of capacity.
Press 06 scrap 4.8% this shift
Above the 2.0% target on the NCR bezel. Flag to quality before the next box ships.
Job close-out synced to ERP
Actual run counts + downtime reasons written back to the new ERP — no double entry.

Where OEE goes

shift losses
Availability loss10.3%
Performance loss18.8%
Quality loss3.1%

A steady 3–5 pt OEE gain across 31 presses is roughly 1–2 presses of capacity you already own — found, not bought.

Why this exists: the ERP you just deployed knows what you planned and what you shipped. It doesn't watch the presses run. This layer sits on top of it — pulling cycle counts and downtime reasons off the floor, turning them into live availability / performance / quality, and writing the actuals back so nobody keys them twice. No MES rip-and-replace, no capex on the floor. The whole pitch: the fastest capacity at Baytech isn't a 32nd press — it's the press-hours already hiding inside the 31 you run. Sample data shown; a real build wires to your presses and your ERP.